Contract share: 100 %
Client: Ontario Power Generation Inc.
University Avenue 700
M5G 1X6 Toronto, Ontario
Canada
Construction period: September 2005–August 2013
The Niagara Tunnel Facility Project comprises the design and construction of an approximately 10.4 km long water conveyance tunnel and associated intake and outlet structures. The alignment of the tunnel will be 140 m below ground and will be able to better utilise the Niagara River for electricity generation.